Cooling towersFans 58%
Gateway42 sensors
Chilled water pumps41 Hz
CH-10.55 kW/RT
CH-20.58 kW/RT
TwinSample site › Chiller plant
Example data
Plant efficiencyLive
0.62kW/RT
TodayBaseline
Cooling load
1,150 RT
Plant power
712 kW
Chilled water supply
6.8 °C
Today 9,640 kWhvs baseline -13.6%Alerts 0

GreenBOS Twin, live chiller plant view. Switch the AI off to see the same plant on its fixed schedule. kW/RT is the electricity the plant uses per ton of cooling; lower is better.

Example data, not a client site.

The problem

Cooling is close to half of a building's energy. Most plants still run on staging rules and setpoints fixed at commissioning.

  • 01

    Chillers staged by fixed rules

    Chillers come on and off by time or by a single temperature, not by the load the building actually needs.

  • 02

    Pumps and fans at full speed

    Pumps and cooling tower fans run harder than the load needs, hour after hour.

  • 03

    Setpoints nobody revisits

    Chilled water and condenser setpoints stay where they were set on day one, whatever the weather.

How it works

Four steps from your first reading to savings you can audit.

  • 01

    Connect

    Sensors and a gateway go in next to your BMS. Nothing in the plant is replaced.

  • 02

    Baseline

    We measure the plant as it runs today, in kW/RT and kWh, so every saving has a reference.

  • 03

    Optimise

    The AI stages chillers and sets water temperatures, pump speeds and tower fans every few minutes.

  • 04

    Verify

    Savings are measured against the baseline and reported every month.

Fail-safe by design. If our connection drops, the plant falls back to its existing sequencer. Cooling never depends on us.

AI engine: Mi-ACE, co-developed with MIMOS

Works with what you have

Any chiller brand, any BMS. We add the measurement and the control, not new plant.

  • Equipment we control

    Chilled water pumpsAir handlersCooling tower fansChillersCondenser water pumps
  • What we measure

    Supply and return temperaturePowerCooling load (RT)FlowkW/RT
  • Brands we have worked with

    Chillers:
    Trane, York, Carrier, Daikin
    BMS:
    Niagara, Tracer, Honeywell, Johnson Controls, IGSS, Loytec
Results

Measured at the plant, against its own baseline.

See all plants →
TypeEstimated money savedPlant sizeCountryChillersBMS
Jaya OneShopping MallRM36,324.881,350 RTMalaysiaYorkSCM
Robert BoschFactoryRM20,949.001,700 RTMalaysiaTrane, YorkNiagara
SanminaFactoryRM19,965.913,050 RTMalaysiaTraneN/A
BTMCHospitalRM18,551.131,050 RTMalaysiaYorkOptergy
FujiFactoryRM16,684.707,000 RTMalaysiaTraneIGSS
BSC EW & WWShopping MallRM14,725.837,650 RTMalaysiaYorkNiagara
NUMEDUniversityRM9,491.60960 RTMalaysiaCarrierSCM
KPJ Ampang PuteriHospitalRM8,880.041,650 RTMalaysiaTrane, DaikinN/A

Want a number for your plant?

Your request is tagged Chiller Plant Optimisation, so it goes straight to the chiller team.

How you pay

No upfront cost with Savings-as-a-Service.

You pay from the energy the plant saves, and the system is yours after five years.

Cooling tower fans on a rooftop, seen from above

Find out what your chiller plant is wasting.

A site assessment gives you a baseline and a savings estimate before you commit to anything.

Related: Fault Detection and Equipment Health

Your details will be used to respond your enquiry. Privacy notice